Connect Vertices of RBD With Wires

   1497   0   1
User Avatar
Member
1 posts
Joined: 3月 2011
Offline
Hello,

I am desperately trying to connect a couple of vertices from two animated RBDs (spheres) with wires. When I use the Wire Pin Constraint it works in a way but the end points of the wires have to have exactly the position of a vertices of the spheres – any hints?
Thanks in advance!

Attachments:
2ConstraintsWire.hipnc (446.9 KB)

  • Quick Links