I am trying to figure out a way to use wire solver pin constraints stick to the cable ends even if I change the resample values or bridge leg counts.. I thought apply relationships is the right approach. However, I have this issue.
I have my bridge setup only from one curve. transformed, and mid cables are created with an add node, got groups designates end points of these nodes, etc etc, but I seem to loose the end point groups after adding add nodes …
Problem I am trying to solve is how to carry, or copy the group points to the end of the line just before the DOP IMPORT so I can use these points as Constrain Points, even after new points are created ude to new size of my bridge,
Sample file below…
Or basically is there a way to use wires, tension map to create snapping points….
WireBridge_Apply_Relationship (Solved)
1622 0 0- tricecold
- Member
- 260 posts
- Joined: 7月 2006
- Offline
Head of CG @ MPC
CG Supervisor/ Sr. FX TD /
https://gumroad.com/timvfx [gumroad.com]
www.timucinozger.com
CG Supervisor/ Sr. FX TD /
https://gumroad.com/timvfx [gumroad.com]
www.timucinozger.com
-
- Quick Links